Warm Water Tank Replacement

Water tank fabrication and replacement during planned annual shutdown

Services Used: Products - Supply & Install, Maintenance Engineering


A warm water collection and distribution tank nestled deep within existing plant required replacement during a planned 5 day annual shutdown. MEL were engaged to detail a replacement strategy and manage the replacement project including reverse engineer tank construction details, preparation of scope of works and contractor management. The existing tank had reached the end of life due to corrosion, so a replacement carbon steel tank was fabricated and painted locally. Piping was rationalised, removed, and replaced to minimise outage works and enable the old tank to be lifted straight out and the new tank lifted straight back in.


Contact us to engineer your solution

Other MEL Work

Machine safety guarding

Safety guard hazard assessment audits through to design and installation of safety guards.

Read More

CFD Study Investigating Dispersion of Gas Discharged from a Stack

Read More

CD2 Weld Overlay

Corrosion protection on short plant shut-down timeline

Read More