Warm Water Tank Replacement

Water tank fabrication and replacement during planned annual shutdown

Services Used: Products - Supply & Install, Maintenance Engineering


A warm water collection and distribution tank nestled deep within existing plant required replacement during a planned 5 day annual shutdown. MEL were engaged to detail a replacement strategy and manage the replacement project including reverse engineer tank construction details, preparation of scope of works and contractor management. The existing tank had reached the end of life due to corrosion, so a replacement carbon steel tank was fabricated and painted locally. Piping was rationalised, removed, and replaced to minimise outage works and enable the old tank to be lifted straight out and the new tank lifted straight back in.


Contact us to engineer your solution

Other MEL Work

Industrial Plant Ventilation system

Design and supply of an improved ventilation system

Read More

Warehouse Loading Bay - Pedestrian Walkway

Design and installation of safety walkway

Read More

Boiler Induced Draught (ID) Fan Impeller

Improve the lifetime of a boiler induced draught fan (ID Fan) impeller

Read More